Our Parking Lot Project
|
Our Recent Project: New Elevator
Our desire is that all people might be able to attend our church services! Unfortunately, there were some who couldn't attend our services because we didn't have an elevator. We are excited to have solved that problem.
The new elevator has been installed near the main front entrance (where the old lift was) and is able to go upstairs and downstairs.
The new elevator is installed and operational! Thank you to all who contributed and supported this project!
Our Completed Project: Renovations
January of 2018 brought a significant challenge to our church body when a pipe froze and burst. At that point, we began efforts to address the issue, fix the needed repairs and concentrate on preventative measures to be prepared to ensure steps to be ahead of any potential future challenges. Our project was handled in various phases and came to a close in the month of December with the building being reopened and all areas useable. While anyone who has embarked into a renovation project knows it can be quite challenging, we thank God for His blessings and for the leadership and people of this church for their prayers, patience and countless volunteer hours freely given. Without all of that, we simply would not be in the great place we are!